Aimed at enhancing the effectiveness and efficiency for offshore plat form project scheduling, a multi agent collaborative scheduling\nmodel based on the analysis of distributed offshore platform project scheduling was proposed. The functional definitions and\ninternal structure of agents in the proposed system were analyzed. Moreover, in order to explore the cooperative way of agents,\ncommunication mechanism was presented and a negotiation model was elaborated. Then, system architecture and hardware\narchitecture were constructed to lay a foundation to develop the collaborative scheduling system. Finally, an intelligent algorithm\nbased on Bayesian method was designed to verify the negotiation model and a prototype system was developed to test the feasibility\nand rationality.
Loading....